First fixing done and dusted!





Look - no pillars! I hated them so much and now they've been incorporated into the design. The doorway on the left goes into Edmund's new surgery, while the pillars have been used to form a corridor.

Lovely plastering. Here we're waiting for the ducting for the air con and air tempering system to go in, then the suspended ceiling can be put in place.








What a transformation! The whole of the back corridor has been stripped back to the brick and replastered and the door you can see in the picture on the left has been blocked up.